Packages · Hyderabad · 2026
Every Indek package sits on the same M20-grade RCC skeleton with the same 10-year structural warranty. You're choosing finishes, not safety.
All rates indicative for 2026 — your rate is fixed in the agreement and never escalates mid-project.
The smart first build
Premium, everywhere you touch
The statement home
Managing finishes yourself? We'll deliver the engineered skeleton — design, excavation, foundation and complete RCC frame with a dedicated civil engineer — and hand over a structure you can warranty. Ask about structural work.
*Indicative 2026 rates. Exact brand list and rate are fixed in your agreement after site assessment.
Side by side
| Feature | Standard | Premium | Platinum | Signature |
|---|---|---|---|---|
| Rate (indicative)* | ₹1,950/sq ft | ₹2,150/sq ft | ₹2,400/sq ft | ₹2,650/sq ft |
| M20 RCC structure | ✓ | ✓ | ✓ | ✓ |
| 10-yr structural warranty | ✓ | ✓ | ✓ | ✓ |
| Site engineer | ✓ Full-time | ✓ Full-time | ✓ Full-time | ✓ Full-time |
| Windows | UPVC 80-series | UPVC 90-series | UPVC 90-series | Premium 90-series |
| Flooring | Vitrified | Double-charged | 2×4 double-charged | Double-glaze designer |
| Internal doors | Flush | Flush premium | Teak | Teak designer |
| Soil test + 3D design | — | ✓ | ✓ | ✓ |
| Anti-termite treatment | — | ✓ | ✓ | ✓ |
| Elevation texture paint | — | — | ✓ | ✓ Designer |
| Stage-verified payments | ✓ | ✓ | ✓ | ✓ |
Package questions
Only the finishes. All four packages share the same M20-grade RCC structure, the same engineers, and the same 10-year structural warranty — the rate difference buys better tiles, doors, windows, bathrooms and paint, never a better skeleton.
Yes. Keep a Premium base and take Platinum bathrooms, or Standard base with Premium windows — each upgrade is priced per item, in writing, before work starts.
No. The per-sq-ft rate in your agreement is fixed for the project duration. Material price swings are our risk, not yours — that's the point of a package.
Structural design, drawings and Vastu consultation are included in every package; Premium and above add soil testing and the full 3D design package. Government/GHMC approval fees are billed at actuals with receipts.