Guides · Trust · All guides

Trust is on paper — or it isn't

You can check whether a builder in Hyderabad is trustworthy with 7 verifiable checks: a registered written agreement, a warranty clause with the years stated, a named site engineer, a stage-wise payment schedule, material brands specified on paper, running sites you can walk today, and valid GST and company registration. None of these need technical expertise — only the patience to ask, and the discipline to walk away when the answer is a shrug. Here is how to run each check before any advance leaves your account.

Why can't you judge a builder by finished houses?

Because a finished house hides everything that matters: steel spacing, concrete grade, curing days, waterproofing under the tiles. By handover, the money is already spent — and on a typical 150 sq yd plot, a G+1 build is roughly 2,300 sq ft of built-up area (1,350 sq ft of plot × ~85% ground coverage × 2 floors). At Hyderabad's 2026 turnkey range of ₹1,700–₹3,800 per sq ft, that is ₹45–61 lakh at typical mid-market rates riding on your choice. Run your own plot through the 60-second estimator first, so every quote you hear has a number to be compared against. Then verify the builder, not the brochure.

What are the 7 checks that actually verify a builder?

#CheckAsk forPass looks like
1Written, registered agreementA signed construction agreement in the company's registered nameEvery rate, area, date and brand inside the document — not in WhatsApp chats
2Warranty clauseThe structural warranty as a clause, years statedIndustry default is 1 year; 10 years in the agreement is the benchmark — we sign ten
3Named engineerThe site engineer's name and number before you signOne accountable engineer plus a dedicated project WhatsApp group
4Stage payment scheduleInstalments tied to physical milestones, in the agreementMoney moves only after you verify each stage on site
5Material brands in writingCement, TMT steel, wiring and pipe brands named per itemBrand and grade specified — "premium quality" is not a specification
6Running-site visitsAddresses of 2–3 sites under construction right nowYou choose which site and when — not a guided tour of one showpiece
7GST & company registrationGSTIN and registration details on the quotationNumbers verify on the official portals and match the agreement name

Score honestly: a builder who passes five of seven is asking you to gamble on the other two.

What documents should a builder show you before you sign?

What should the construction agreement contain?

The agreement is where trust stops being a feeling and becomes enforceable. Before signing, check that it contains, at minimum:

  1. Scope and area: built-up area in sq ft, floors, and what the rate includes and excludes — the vague "etc." is where disputes live.
  2. The rate and total: per-sq-ft rate × area, with the escalation terms (if any) written down.
  3. The stage schedule: which instalment follows which physical milestone. How large the advance is matters as much as the schedule itself — see zero-advance vs stage payments for how the two models compare.
  4. The warranty clause: years, what it covers, and who honours it. Most agreements in Hyderabad default to 1 year; a 10-year structural warranty in the agreement is the standard we hold ourselves to.
  5. Material brands and grades: named per item, so "equivalent brand" substitutions need your sign-off.
  6. Timeline and delay terms: a completion month, and what happens if it slips.

Agreement structure varies with your land and loan situation — this guide is educational, so confirm the specifics with your lawyer and, if you are borrowing, your bank.

How do you separate red flags from green flags?

SignalRed flagGreen flag
Advance20%+ demanded before excavation5–10% signing amount; the rest stage-verified
WarrantyVerbal "lifetime guarantee"Years written into the agreement
Pricing"Call for best price"Per-sq-ft rates published before you ask
Materials"Only the best brands, don't worry"Brand and grade named per item, in writing
Site accessTours of finished homes onlyAny running site, any working day
CommunicationOne salesman answers everythingNamed engineer plus a project WhatsApp group
Paper trailCash-only requests, no receiptsGST invoices against every payment

How should you use a running-site visit?

A running site is the one place a builder cannot stage-manage. Ask for addresses near you — a builder active around Neredmet, Malkajgiri or Sainikpuri should produce them instantly, not "we'll arrange something". On site, look for three things: cleanliness and material storage (cement off the ground, steel not rusting in mud), whether a site engineer is actually present, and whether the owner — if you meet them — would hire the builder again. Skipping this check is one of the classic mistakes first-time builders make: it costs one Saturday and can save you the single most expensive decision of the project.

BEFORE YOU SIGN

Run the numbers before you run the checks

The 60-second estimator gives your plot's honest cost range; the packages page shows exactly what each rate buys — brands, grades and all.

Get my estimate

Frequently asked

How do I verify a builder's GST number in Hyderabad?

Enter the GSTIN printed on the builder's quotation into the Search Taxpayer tool on the official GST portal and check that the registered name matches the name on your agreement. A builder who invoices under a different name than the one you signed with has broken your paper trail before work begins.

Is a 10-year structural warranty normal for builders in Hyderabad?

No — the industry default is a 1-year warranty, which usually expires before the structure has faced a full monsoon cycle. Indek Infra writes a 10-year structural warranty into the construction agreement itself, which is why the warranty clause is check number two on this list.

How much advance should I pay a builder before construction starts?

A signing amount of 5–10% is reasonable to mobilise design, approvals and site setup; anything above 20% before excavation is a red flag. With a stage-verified schedule the rest of your money moves only after you inspect each completed stage on site.

Does a house construction agreement need to be registered?

At minimum the agreement must be written, signed by both parties, and made in the builder company's registered name — never a verbal understanding. Whether it should also be registered or notarised depends on your specific arrangement and the land situation, so confirm the specifics with your lawyer before signing.

Can I bring my own engineer to inspect a builder's running site?

Yes, and a trustworthy builder will welcome it. Thirty minutes of an independent engineer's time at a slab stage tells you more than any brochure — and a builder who refuses third-party inspection is failing the running-site check in spirit, whatever the sales pitch says.

Estimate my cost See packages All guides