Guides · Decision · All guides
Grey structure construction costs ₹1,000–1,100 per sq ft in Hyderabad in 2026; full packages run ₹1,950–₹2,650. The gap looks like savings. Sometimes it is. This guide is the honest version of when.
| Scope | Grey structure ₹1,000–1,100/sq ft | Full package ₹1,950–2,650/sq ft |
|---|---|---|
| Design, drawings, Vastu | ✓ | ✓ |
| Excavation & foundation | ✓ | ✓ |
| RCC frame (M20, TMT) | ✓ | ✓ |
| Brickwork & plastering | ✓ | ✓ |
| Flooring, doors, windows | — | ✓ |
| Electrical & plumbing fittings | Conduits only | ✓ |
| Kitchen, bathrooms, paint | — | ✓ |
| Site engineer | ✓ | ✓ |
| 10-yr structural warranty | ✓ | ✓ |
| Single point of accountability | Structure only | ✓ Everything |
Take a 150 sq yd G+1 (~2,300 sq ft — full breakdown here):
The package's bulk buying roughly cancels the contractor margin you think you're saving. What you're really choosing between is your time and coordination risk.
Both routes get the same M20-grade RCC structure and the same 10-year structural warranty. Price both for your plot in 60 seconds.
Estimate both optionsIn our scope, yes — internal and external plastering are part of the grey structure, so you hand over to finishing trades with clean surfaces. Always check this line item; some builders exclude it.
Yes. Finishing can be added as a separate package on transparent per-item rates at any point — several of our clients build the structure first and finish a year later as funds free up.