Guides · Plot size · All guides
A G+1 house on a 150 sq yd plot in Hyderabad costs about ₹45–61 lakh in 2026. The plot is 1,350 sq ft; at ~85% ground coverage over two floors you build roughly 2,300 sq ft, and at package rates of ₹1,950–₹2,650 per sq ft that lands between ₹45 lakh (Silver) and ₹61 lakh (Signature). Most families choose Gold at about ₹49 lakh.
| Step | Value |
|---|---|
| Plot area | 150 sq yd × 9 = 1,350 sq ft |
| Per-floor built-up (~85%) | ~1,150 sq ft |
| G+1 built-up | ~2,300 sq ft |
| Silver @ ₹1,950 | ~₹45 lakh |
| Gold @ ₹2,150 | ~₹49 lakh (most chosen) |
| Platinum @ ₹2,400 | ~₹55 lakh |
| Signature @ ₹2,650 | ~₹61 lakh |
Indicative 2026 rates. Open parking is billed at ~65% of the package rate; compound wall, approvals and borewell are separate — see the full cost guide for those.
Comparing plot sizes? See the 100 sq yd budget and the 200 sq yd duplex guide.
Enter length × breadth, floors and package; get your honest range in 60 seconds.
Estimate my plotOnly with compromises a good engineer would talk you out of. At 2026 material prices, ₹45 lakh (Silver package) is the realistic floor for a full-quality 2,300 sq ft G+1; ₹40 lakh means shrinking built-up area, not quality.
About 9–10 months from excavation to keys with a properly staffed site: roughly 5 months of structure, then 4–5 of finishing and handover checks.
Orientation doesn't change the construction rate. It changes the plan: Vastu-compliant layouts for east and west facings are included in every Indek package's design phase.