Hard Hat Zone

Initializing build...

Hard hats on · Indek Infra, Hyderabad

Your build · Plot to keys

Stage 01 / 06

Stage 01 · Survey & approvals

Digital survey, soil test, approvals

Digital site survey, soil test report and GHMC/HMDA sanction — the ground truth and the paperwork settled before anything moves.

Weeks 1–3 · You pay ₹0 to start

Stage 02 · Design

2D floor plans, signed off by you

Floor plans, structural drawings and Vastu consultation — the design is frozen with your signature before we dig, so nothing changes mid-build.

Weeks 3–5 · Design freeze

Stage 03 · Foundation

Foundation works begin

Excavation, anti-termite treatment and footings poured in tested M20-grade concrete. You verify the foundation physically before the first payment.

Weeks 5–10 · Stage-verified payment #1

Stage 04 · Slab casting

Columns rise, slabs cast

The RCC skeleton that carries your 10-year warranty: branded TMT steel, 53-grade cement, every pour signed off by a certified structural engineer.

Months 3–5 · Slab-by-slab verification

Stage 05 · Internal works

Walls, wiring, water — tested

Brickwork, plastering, UPVC windows, then fire-retardant wiring and plumbing — pressure-tested before a single wall is closed.

Months 5–8 · Systems tested

Stage 06 · Handover

Keys in hand. Warranty in writing.

Tiling, painting, fixtures, deep cleaning and a joint inspection — then handover with your 10-year structural warranty inside the agreement.

Months 9–10 · Welcome home

Keep scrolling — your home builds itself ▼

Indek Infra · Hyderabad & Secunderabad

We build homes that outlast the loan.

Engineer-led house construction in Hyderabad — published per-sq-ft rates, stage-verified payments, and the city's only 10-year structural warranty, in writing.

  • 30+ years in construction
  • From ₹1,950 / sq ft*
  • Certified structural engineers
  • Dedicated WhatsApp group per project

*Indicative 2026 rate. Final rate fixed in your agreement — and it stays fixed.

30+
Years in industry
10yr
Structural warranty
4
Transparent packages
1
Engineer on every site

What we build

From plot to keys,
one accountable team

Why choose Indek

Built on honesty & engineering facts

We don't offer generic promises. Every Indek home built in Hyderabad is backed by verifiable, engineer-led structural specifications.

Engineer-Led Supervision

Every critical structural phase—foundation pouring, column reinforcement, and slab casting—is checked on-site by a qualified structural engineer.

10-Year Written Warranty

Backed by 30+ years of construction experience. While standard builders offer a verbal promise or 1 year, we write a 10-year structural warranty directly into your contract.

Daily WhatsApp Updates

Stay updated without constant physical site visits. You receive high-resolution photo and video logs on a dedicated project WhatsApp group daily.

Flexible Payment Plans

As the best in class construction company in Hyderabad, we offer highly flexible, stage-wise payment plans. Split your billing into clear physical milestones so you only pay for what you see.

Construction packages · Hyderabad

Published rates.
No "call for price".

Same M20-grade structure in every package — the difference is finishes, and you choose those. Rates indicative for 2026.

Standard

₹1,950 /sq ft*
  • M20 RCC structure, TMT steel
  • Vitrified tile flooring
  • Teak main door
  • ISI wiring & fittings
Most chosen

Premium

₹2,150 /sq ft*
  • Fe-550 steel, 53-grade cement
  • Double-charged tiles
  • UPVC 90-series windows
  • Soil test + full design package

Platinum

₹2,400 /sq ft*
  • Premium branded steel & cement
  • Granite platform, designer tiles
  • Teak internal doors
  • Premium sanitary & electricals

Signature

₹2,650 /sq ft*
  • Structural-grade branded steel
  • Double-glaze designer tiles
  • 8-ft designer main door
  • Top-line sanitary & automation-ready

*Indicative rates, 2026. Every package: 10-year structural warranty · dedicated site engineer · stage-verified payments · transparent billing.

Recent work

Built by Indek

Photo — G+2 residence
A.S. Rao Nagar
Photo — Duplex villa
Sainikpuri
Photo — Commercial complex
ECIL

Project photography being curated — real Indek builds only, no stock.

Why choose turnkey

Traditional Contractors vs. Indek Turnkey

Building a home is Hyderabad's biggest investment. Here is how we protect you compared to local, unorganized builders.

Feature Traditional Contractors Indek Infra Turnkey
Price Lock Guarantee Verbal estimates; frequent cost changes mid-project due to material rises 100% Fixed price contract; rates locked in writing before build starts
Site Supervision Unsupervised local labor; work managed by uncertified sub-contractors Critical structural phases checked on-site by a qualified structural engineer
Payment Terms High advance demands; contractor controls funds before work starts Milestone-based verified payment stages; you pay only after validating completed steps
Structural Warranty Usually 1 year or completely verbal; zero safety backup 10-year structural warranty legally written into your construction agreement
Design & Layout Rely on standard layouts; Vastu parameters often ignored Custom design layouts optimized by licensed architects for space & Vastu
Daily Tracking Unpredictable updates; requires frequent physical site visits to verify progress Daily high-resolution photo & video progress logs sent directly to your WhatsApp group

Straight answers

Before you ask

How much does it cost to build a house in Hyderabad in 2026?

Full house construction in Hyderabad costs roughly ₹1,950–₹2,650 per sq ft in 2026 depending on the finish package; a G+1 home on a 150 sq yd plot works out to about ₹45–65 lakh. Grey structure alone starts near ₹1,000 per sq ft. Use our 60-second estimator for your plot's range.

What does the 10-year structural warranty actually cover?

The 10-year warranty covers the structural system — foundation, columns, beams and slabs — against structural defects, and it is written into your construction agreement, not a brochure promise. Finishes carry their manufacturers' warranties on top.

How do stage-verified payments work?

You pay in slabs tied to physical progress: each payment is due only after you (or your representative) verify the completed stage on site. No large advances, no paying for work you can't see.

Do you build on small plots — 100 to 150 square yards?

Yes — most Hyderabad homes we build are on 100–200 sq yd plots. A 150 sq yd (1,350 sq ft) plot typically supports a built-up area of about 2,300 sq ft as G+1, comfortably a 3–4 bedroom home.

Know your cost before you dig.

Get my estimate Talk to an engineer