Guides · Cost · All guides
Building a house in Hyderabad costs ₹1,950–₹2,650 per sq ft in 2026 for full-package construction — structure, finishes, electrical, plumbing and painting included. Structural-only (grey structure) work starts near ₹1,000 per sq ft. The wider market quotes anywhere from ₹1,700 to ₹3,800; the spread is almost entirely finishes, not structure.
That's the answer. The rest of this guide is the working — so you can check any builder's quote, including ours.
| Package | Rate / sq ft* | Built for |
|---|---|---|
| Grey structure | ₹1,000–1,100 | Self-managing finishes — full comparison |
| Silver | ₹1,950 | Smart first build, quality ISI-grade finishes |
| Gold | ₹2,150 | Most chosen: soil test, 3D design, premium windows |
| Platinum | ₹2,400 | Teak doors, granite, premium sanitary throughout |
| Signature | ₹2,650 | Statement homes, top-line brands, automation-ready |
*Indek Infra indicative rates, 2026, inclusive of the 10-year structural warranty. Fixed in the agreement — no escalation clauses.
| Plot | G+1 built-up | Silver ₹1,950 | Gold ₹2,150 | Signature ₹2,650 |
|---|---|---|---|---|
| 100 sq yd | ~1,530 sq ft | ~₹30 L | ~₹33 L | ~₹41 L |
| 150 sq yd | ~2,300 sq ft | ~₹45 L | ~₹49 L | ~₹61 L |
| 167 sq yd | ~2,555 sq ft | ~₹50 L | ~₹55 L | ~₹68 L |
| 200 sq yd | ~3,060 sq ft | ~₹60 L | ~₹66 L | ~₹81 L |
| 267 sq yd | ~4,085 sq ft | ~₹80 L | ~₹88 L | ~₹1.08 Cr |
Add parking (billed at the open-area rate), and add extras below. For your exact plot, the 60-second estimator does this math with your dimensions.
A trustworthy quote lists its exclusions. A dangerous one hides them until slab three.
Three lines to demand in any construction agreement in Hyderabad:
Plot size + floors + package → an honest ₹ range in 60 seconds, no phone call needed.
Get my estimateFull construction runs ₹1,950–₹2,650 per sq ft depending on finishes; the wider market spans roughly ₹1,700–₹3,800. Grey structure starts near ₹1,000 per sq ft.
On your own plot, building usually delivers 30–40% more carpet area per rupee than buying an apartment at 2026 prices — and you own the land outright. The trade-off is a 9–12 month build timeline.
A G+1 home typically takes 9–10 months from excavation to handover; each additional floor adds roughly 6–8 weeks. Monsoon slowdowns are usually absorbed by good scheduling.
Not if your agreement has no escalation clause. At Indek Infra the signed rate is final — cement and steel price swings are our risk, not yours.