Guides · Plot size · All guides
A duplex on a 200 sq yd plot in Hyderabad costs about ₹60–81 lakh in 2026. The plot gives you 1,800 sq ft; at ~85% coverage over G+1 that's roughly 3,060 sq ft of built-up area, costing ₹60 lakh at Silver rates and ₹81 lakh at Signature. This is the plot size where a true duplex — double-height hall, internal stair, single grand home — starts making sense over two stacked independent floors.
| Build | Built-up | Silver ₹1,950 | Gold ₹2,150 | Platinum ₹2,400 | Signature ₹2,650 |
|---|---|---|---|---|---|
| G+1 duplex | ~3,060 sq ft | ~₹60 L | ~₹66 L | ~₹73 L | ~₹81 L |
| G+2 | ~4,590 sq ft | ~₹90 L | ~₹99 L | ~₹1.10 Cr | ~₹1.22 Cr |
Indicative 2026 rates. Duplex internal stair adds ~₹1.5 lakh; stilt parking, compound wall and approvals are separate — full exclusions in the 2026 cost guide.
Planning something more ambitious than a duplex? That's our villa construction service.
Plot dimensions, floors, package — an honest ₹ range with the duplex premium included.
Estimate my duplexYes — at Silver-package finishes it buys the full ~3,060 sq ft structure with quality ISI-grade fittings. Most duplex builders at this size choose Gold or Platinum, landing between ₹66–73 lakh.
Plan for 10–12 months: the double-height hall and stair detailing add finishing time over a standard G+1's 9–10 months.
Yes, compact duplexes work on 150 sq yd — you trade the double-height hall for an extra bedroom. Budget-wise see the 150 sq yd guide.