The Hidden Danger of Cheap Plumbing
Plumbing pipes are embedded deep within your brickwork and concrete. A single leak can cause massive structural dampness and require breaking expensive tiles to repair. Choosing the correct polymer pipe is critical.
1. CPVC (Chlorinated Polyvinyl Chloride)
CPVC is the premium choice for modern indoor plumbing, characterized by its creamish-yellow color.
- Best For: Both HOT and COLD water supply lines.
- Pros: Can withstand temperatures up to 93°C (200°F), highly durable, scaling resistant, fire retardant.
- Cons: More expensive than UPVC and PVC.
- Top Brands: Ashirvad, Supreme, Astral.
2. UPVC (Unplasticized Polyvinyl Chloride)
UPVC is a rigid, strong plastic pipe usually white in color.
- Best For: COLD water supply only.
- Pros: Very strong, lead-free, cost-effective, UV resistant (suitable for exposed outdoor lines).
- Cons: Cannot handle hot water (will warp and burst).
3. SWR PVC (Soil, Waste, and Rainwater)
These are the large, grey pipes used for drainage.
- Best For: Drainage, sewage, and rainwater harvesting.
- Pros: Large diameter, smooth inner surface prevents clogging, highly chemical resistant.
- Cons: Not suitable for pressurized water supply.
Indek Infra’s Plumbing Standard
We eliminate plumbing risks by exclusively using Ashirvad/Astral CPVC for all internal hot and cold water lines, ensuring maximum thermal tolerance and longevity. All our plumbing networks undergo a strict 24-hour pressure test at 6kg/cm² to guarantee zero leaks before the walls are plastered.
Build Your Dream Home with Indek Infra
We don't compromise on materials, and neither should you. Our transparent packages spell out exactly which premium brands go into your home, backed by a 10-year structural warranty.
Book a Free Site Consultation